[BEIER] 100pcs 5mm 395-400nm UV Ultraviolet LED Light Emitting Diode Flat Lens 29mm Long Lead (DC 3V) LEDs Lights +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps >>>UV Curing Equipment

[BEIER] 100pcs 5mm 395-400nm UV Ultraviolet LED Light Emitting Diode Flat Lens 29mm Long Lead (DC 3V) LEDs Lights +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps >>>UV Curing Equipment
Price: $25.99 - GBP6.05
(as of Jun 26, 2026 16:57:41 UTC – Details)

Patented Magnetic Seal Lid Tumblers/Cups/Mug etc.>>> Well hello there! If you’d like to get in touch with me, please feel free to give me a call at 0086 17062510121, or send a message with the Comment form down below. Either way, I’ll be in touch shortly!

Or Send US An Email : ccwto.net@gmail.com . Either way, I’ll be in touch shortly!



* Low Energy Consumption And Low Heat.
* Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation.
* Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
* Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.
* Get other LED models? Please search “EDGELEC Diodes”.
Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
Product Features: UV Lights / 5mm Flat Clear Lens Lens
Product Parameters: 29mm Long Lead / DC 3.0V-3.4V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
Product Parameters: Luminance Brighter Up To +20% / 60° Viewing Angle / Single LED Diodes Wight: 0.24g
Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / ±1% Tolerance


Spread the love
Author: ccwto.net